The Shelby Farms Greenline in Tennessee
⚡ Tennessee
Explore Shelby County by eBike
eBikeListings › Tennessee › Shelby County › Things to Do

Things To Do on an eBike in Shelby County, TN

Shelby County has two main paved corridors for eBikes: the Shelby Farms Greenline and the Wolf River Greenway. Both are run by local groups, and neither manager page lists a separate eBike rule. That means Tennessee law is your guide. Class 1 and Class 2 eBikes may use paths intended for bicyclists. Class 3 generally may not.

Shelby Farms Park adds more than 40 miles of multi-use trails, paved and unpaved. Wolf Crossing links the Greenline to the Wolf River Greenway across a 270 foot cable stayed suspension bridge. Below you will find six routes, with the manager, surface, and eBike rule for each. Where sources disagree on length, both numbers are given.

Orientation map, not a verified riding route.Open county map

Where to ride in Shelby County

The routes sit in Memphis, Germantown, and Cordova. The Shelby Farms Greenline runs from Midtown Memphis east to the Cordova Depot. The Wolf River Greenway starts near Mud Island downtown and runs through Hyde Park and Kennedy Park toward Shelby Farms Park and Germantown. Shelby Farms Park sits between them, and Wolf Crossing joins the two greenways east of the park.

The Greenline is paved and runs 12.94 miles per the park conservancy, though TrailLink says 11.6 and a county document says 6.5. The Wolf River Greenway is paved asphalt, with 14 miles open per its manager and 13.4 per TrailLink. Shelby Farms Park mixes paved trails of 2.75 to 4.1 miles with unpaved loops of 1.9 to 6.0 miles. None of the manager pages list an eBike rule, so state law applies: Class 1 and 2 on paths, Class 3 off paths.

eBike shop hubs

Need a shop before or after your ride? Pick a city below to see its listings. Memphis has the most, and Germantown and Cordova sit along the routes.

Rental and tour contacts

Rental listings include Hyde Lake Wheel House and Explore Bike Share. Call first to confirm they offer eBikes, since class, price, and hours are not published here.

Hyde Lake Wheel House🚲 Rentals

Bicycle rental service · Memphis, TN
★★★★½4.8(9 reviews)
📍 6903 Great View Dr N Memphis, TN 38120 📞 (901) 222-7294

Explore Bike Share🚲 Rentals

Bicycle rental service · Memphis, TN
★★★★4.4(119 reviews)
📍 287 S 4th St Memphis, TN 38126 📞 (901) 721-9006

Explore Bike Share🚲 Rentals

Bicycle rental service · Memphis, TN
📍 115 Beale St Memphis, TN 38103 📞 (901) 295-0707

Explore Bike Share🚲 Rentals

Bicycle rental service · Memphis, TN
📍 726 Island Dr Memphis, TN 38103 📞 (901) 590-2127

Named eBike routes and access checks

1. Shelby Farms Greenline: Midtown to Cordova on rail-trail

The Greenline is a paved urban rail-trail that links Midtown Memphis with Cordova, and it starts at Tillman Street at Walnut Grove Road and ends at B Street and Macon Road at the Cordova Depot. Shelby Farms Park Conservancy manages it, and access points include Highland Street, High Point Terrace, Graham Street, Waring Road, Podesta Street, Sycamore View, Whitten Road, Appling Road, Raleigh LaGrange Road, Germantown Parkway, Cully Road, and A Street. Length is disputed, with the conservancy saying 12.94 miles and its blog saying nearly 13. TrailLink says 11.6 miles from Flicker Street, and a Shelby County document calls it a 6.5 mile trail. Use access points to plan, not one number, because usage figures also conflict: more than 1 million visits a year per the conservancy, over 200,000 per TrailLink.

Distance: 12.94 miles paved, per Shelby Farms Park Conservancy; TrailLink says 11.6 miles and a Shelby County document says 6.5 miles; start: Tillman Street at Walnut Grove Road in Midtown Memphis, or any listed access point; surface: Paved urban rail-trail.

eBike access: The manager page lists no eBike rule, so state law applies: Class 1 and 2 are allowed on paths intended for bicyclists. Class 3 is not, unless the governing body permits it. Etiquette and planning: Pass slowly and call out before overtaking. Expect heavy use on weekends. Check the manager map for access points, since this route has many road crossings. Managing source: Shelby Farms Park Conservancy, Shelby Farms Greenline.

2. Hollywood Section and McLean Cycle Track, levee riding through Hyde Park

This stretch of the Wolf River Greenway covers 3.3 miles built atop a levee through the Hyde Park neighborhood. It connects to Rodney Baber Park. The Hyde Park Section trailhead is at 1833 North Hollywood Street and has trailhead parking. The McLean Cycle Track trailhead is at 2149 James Road and has street parking. The Wolf River Conservancy, Memphis Parks, and Shelby County manage the greenway together as a public/private partnership. The greenway is a 12 foot wide paved pathway, which gives room to pass at easy speeds. Pick this section if you want a short, close-in ride from the city side of the greenway. The levee gives a raised view of the neighborhood below. Check posted signs at each trailhead for current rules.

Distance: 3.3 miles combined for the Hollywood section and McLean Cycle Track, per Wolf River Conservancy; start: Hyde Park Section trailhead, 1833 North Hollywood Street, with parking; surface: Paved pathway built atop a levee.

eBike access: The manager page lists no eBike rule, so state law applies. Class 1 and 2 may use the path. Class 3 may not unless the path is next to a street or permitted. Etiquette and planning: Use street parking courteously at James Road. Keep to the right, slow near neighborhood access points, and watch for walkers sharing the levee. Managing source: Wolf River Conservancy, Wolf River Greenway.

3. Kennedy Park Section, mature forest on the Wolf River Greenway

The Kennedy Park section opened in 2018 and covers 1.5 miles through mature forest. It is part of the Wolf River Greenway, a 12 foot wide paved pathway managed by the Wolf River Conservancy, Memphis Parks, and Shelby County. This is a short stretch, so most riders pair it with neighboring sections instead of treating it as a destination alone. Shade is the main draw. The published facts do not list a specific trailhead for this section, so use the manager map to find access. Length totals for the whole greenway also conflict. The conservancy lists 14 miles open of 26 planned. TrailLink lists 13.4 miles and says the trail may one day span 36 miles.

Distance: 1.5 miles, per Wolf River Conservancy; start: Kennedy Park Section: several access points; check the manager map; surface: Paved pathway.

eBike access: No separate eBike rule is posted on the manager page, so state law applies. Class 1 and 2 are allowed on paths intended for bicyclists, but Class 3 is not. Etiquette and planning: Slow down under tree cover where leaves and shade hide wet spots. Stay right, and give walkers space on this short forest section. Managing source: Wolf River Conservancy, Wolf River Greenway.

4. East Section, toward Germantown and Walnut Grove Road

The East Section of the Wolf River Greenway has 3.6 miles of paved trail. It connects to the Germantown Greenway near Kirby Parkway and runs west past Walnut Grove Road. This is the section that points riders toward Germantown and the Shelby Farms Park area. TrailLink adds that 8.5 miles are open through the Wolf River Nature Area in Germantown, with picnic facilities, restrooms, wildflower meadows, interpretive stops, and rest areas. That figure comes from a secondary source, so confirm amenities on the manager map. The Wolf River Conservancy, Memphis Parks, and Shelby County manage the greenway. The Shady Grove Trailhead at 6324 Humphreys Boulevard has a parking lot and is a published access point on the greenway.

Distance: 3.6 miles of paved trail, per Wolf River Conservancy; start: Shady Grove Trailhead, 6324 Humphreys Boulevard, with a parking lot; surface: Paved; TrailLink lists asphalt.

eBike access: No separate eBike rule is posted on the manager page, so state law applies. Class 1 and 2 may ride the path. Class 3 may not unless permitted or adjacent to a street. Etiquette and planning: Carry water, since TrailLink amenities are not confirmed by the manager. Slow at junctions with the Germantown Greenway and keep right. Managing source: Wolf River Conservancy, Wolf River Greenway.

5. Wolf Crossing, suspension bridge and boardwalk link

Wolf Crossing is mile fourteen of the Wolf River Greenway Trail. It has a 270 foot cable stayed suspension bridge over the Wolf River and a raised concrete boardwalk through the Lucius Burch State Natural Area. It opened in November 2021. It connects the Shelby Farms Greenline with the Wolf River Greenway Trail further east, so it is the link for riders who want to combine the two corridors. The managers are the Wolf River Conservancy, Memphis Parks, and Shelby County for the greenway, and Shelby Farms Park Conservancy for the Greenline. Expect a bridge and boardwalk, so ride slowly and keep clear of rails. Because length totals vary by source, use the bridge as a landmark instead of a mileage marker.

Distance: Mile fourteen of the greenway, with a 270 foot bridge, per Wolf River Conservancy; start: Wolf Crossing: several access points; check the manager map; surface: Cable stayed suspension bridge and raised concrete boardwalk.

eBike access: No separate eBike rule is posted on the manager page, so state law applies. Class 1 and 2 are allowed on paths for bicyclists. Class 3 is not, unless permitted. Etiquette and planning: Walk or ride slowly on the bridge and boardwalk. Stop in wider spots to take photos, and keep the way clear for others to pass. Managing source: Wolf River Conservancy, Wolf River Greenway.

6. Shelby Farms Park paved trails: Promenade, Chickasaw, South, Dunavant

Shelby Farms Park has more than 40 miles of multi-use trails, run by Shelby Farms Park Conservancy. The paved options include the Baptist Memorial Health Care Promenade at 2.34 miles for pedestrians and 2.45 miles for cyclists, the Chickasaw Trail at 2.75 miles, the South Trail at 4.1 miles, and the Dunavant Trail at 3.6 miles. The Greenline at 12.94 miles is also counted among them. Unpaved trails exist too, including Tour de Wolf at 6.0 miles with a bike repair station, plus the White Trail at 1.9 miles, Blue Trail at 3.6 miles, and Yellow Trail at 3.5 miles. The Yellow, White, and Blue Trails lie south of Walnut Grove Road in the Lucius Burch Jr. State Natural Area. Stay on paved trails if you are unsure.

Distance: Paved trails run 2.34 to 4.1 miles each, per Shelby Farms Park Conservancy; start: Shelby Farms Park paved trails: several access points; check the manager map; surface: Paved trails, plus separate unpaved trails including Tour de Wolf.

eBike access: The manager page lists no eBike rule, so state law applies. Class 1 and 2 may use paths for bicyclists, but the park can restrict them. Class 3 is not allowed on paths. Etiquette and planning: Match the trail to your bike. Paved loops suit most eBikes. Check posted signs, especially in the natural area, before you head onto unpaved trails. Managing source: Shelby Farms Park Conservancy, Trails.

Planning a Shelby County ride

The published facts do not list charging stations, so plan to charge at home or at a shop before you ride. Ask a shop in Memphis, Germantown, or Cordova whether it will help with a battery issue. The Greenline has many access points, so you can shorten a ride if your battery runs low. Tour de Wolf in Shelby Farms Park has a bike repair station.

Crowds are heavy on the Greenline, which sees over 200,000 to over 1 million visits a year. Ride at off-peak times if you can. Closures, hours, and fees are not published. Check the manager's map or posted signs. No ferry or transit connection is published. Check the manager's map or posted signs, and plan on driving to a trailhead with parking.

Half-day and full-day eBike plans

Half day: Ride the Shelby Farms Greenline from the Cordova Depot at B Street and Macon Road toward Germantown Parkway, then turn around. Use the access points to cut the ride short. Stay on the paved trail, and finish with a stop at one of the Cordova or Germantown shops.

Full day: Start at the Hyde Park Section trailhead at 1833 North Hollywood Street and ride the Hollywood section and McLean Cycle Track. Continue on the Wolf River Greenway toward Kennedy Park and the East Section, then cross Wolf Crossing to reach the Greenline, and check battery range first.

Rainy-season backup: If weather turns, keep to short paved loops in Shelby Farms Park, such as the Chickasaw Trail at 2.75 miles or the Dunavant Trail at 3.6 miles. Skip unpaved trails like Tour de Wolf, and use the Kennedy Park forest stretch only when the pavement is dry.

What not to ride in Shelby County

Class 3 on paths: Tennessee law currently bars Class 3 eBikes from paths and trails unless the path is within or next to a street or highway, or the governing body permits it. Assume the Greenline and Wolf River Greenway are off limits to Class 3 unless a posted sign says otherwise.

Unpaved trails in Shelby Farms Park: Tour de Wolf, the White Trail, the Blue Trail, and the Yellow Trail are unpaved. The park lists no separate eBike rule, but a manager can restrict eBikes on a path for public safety. Check signs, and stay on paved trails if you are unsure.

Natural area trails: The Yellow, White, and Blue Trails sit in the Lucius Burch Jr. State Natural Area south of Walnut Grove Road. State agencies can regulate or prohibit Class 1 and 2 on a trail for public safety, so read posted signs at each entrance.

Crowded weekend stretches: The Greenline gets heavy use. Even where eBikes are allowed, a fast ride among walkers and families is a bad idea. Slow down at road crossings and access points, and ride at off-peak times if you can.

When to ride Shelby County

Memphis summers are hot and humid, so early morning or evening rides are more comfortable, and spring and fall are usually milder. Tree cover on sections like Kennedy Park can help with shade. The Greenline is busiest on weekends, with usage figures ranging from over 200,000 to over 1 million visits a year depending on the source. Trail hours and closures are not published here, so check the manager pages and posted signs before you go.

Tennessee eBike laws and route permission

Tennessee sorts eBikes into three classes. Class 1 is pedal assist with a top assisted speed of 20 mph. Class 2 has a throttle and also tops out at 20 mph. Class 3 is pedal assist with a top assisted speed of 28 mph. The rules for all three sit in the state code, including TCA 55-8-306, which covers where each class may be ridden. Know your bike's class before you ride, because the class decides where you can go.

Class 1 and Class 2 eBikes may go where bicycles may go. That includes bike lanes, shoulders, and paths or trails for bicyclists. On roadways, eBikes are restricted to the same extent as bicycles. A local government, by resolution or ordinance, or a state agency, by rule or policy, may regulate or prohibit Class 1 and 2 on a path or trail for public safety. Class 3 is not allowed on any path or trail unless it is within or adjacent to the street or highway, or the governing body or state agency permits it. SB 1782 (Public Chapter 651, signed April 2026) also lets local governments and state agencies regulate or prohibit Class 1 and 2 on parts of streets and highways where bicycles travel. It clarifies the Class 3 path ban. Effective July 1, 2026, the minimum age to operate a Class 3 on a street or highway rose from 14 to 16. Riders under 16 may ride a Class 3 only as a passenger.

Every operator and passenger on a Class 3 eBike must wear a helmet. The general bicycle helmet rule for riders under 16 (TCA 55-52-105) also applies. Tennessee does not require a license or registration for eBikes. Local rules can still change where you may ride, so check with the city, county, or park before heading out. For a fuller walkthrough, read our guide to Tennessee eBike laws.

Trail access in Tennessee is decided by whoever manages the trail. A local government can restrict or ban Class 1 and 2 eBikes on a path or trail for public safety, using a resolution or ordinance. A state agency can do the same through a rule or policy. So a trail that allows regular bicycles may still have its own eBike rule. Look for posted signs at the trailhead and check the manager's website or office first.

Class matters most on trails. Class 1 and 2 follow bicycle access unless the manager says otherwise. Class 3 is kept off paths and trails unless the path is within or adjacent to a street or highway, or the governing body or agency permits it. If you ride a Class 3, do not assume a trail is open to you. Ask first. Managers may set their own limits, so check posted rules for each park or greenway.

No separate Shelby County or City of Memphis eBike ordinance, sidewalk riding rule, or pending local eBike change is posted on the manager pages for the Greenline, the Wolf River Greenway, or Shelby Farms Park. Tennessee law is the working rule. Class 1 and 2 may ride where bicycles may, and managers may prohibit them on a path for safety.

State rules changed recently, and Senate Bill 1782 became Public Chapter 651 in 2026. It lets local governments and state agencies regulate or prohibit Class 1 and 2 on parts of streets where bicycles travel, and it clarifies the Class 3 path ban. Effective July 1, 2026, the minimum age to operate a Class 3 on a street is 16; see the SB 1782 bill page.

Source conflicts matter for planning. The Greenline is 12.94 miles per Shelby Farms Park Conservancy, 11.6 per TrailLink, and 6.5 per a Shelby County document. The Wolf River Greenway has 14 miles open of 26 planned per Wolf River Conservancy, while TrailLink lists 13.4 miles and a future span of 36. Trust the manager map and posted signs. Read the Tennessee eBike laws for the state rules.

Frequently asked questions

Can I ride a Class 2 throttle eBike on the Greenline?

Under Tennessee law, Class 1 and Class 2 eBikes may be ridden on paths and trails intended for bicyclists. The Greenline manager page lists no separate eBike rule. A manager can restrict them for public safety, so follow any posted sign.

Are helmets required?

Every Class 3 operator and passenger must wear a helmet. Tennessee also has a general bicycle helmet rule for riders under 16. Adults on Class 1 or 2 eBikes are not covered by those two rules, but a helmet is still a smart choice on shared paths.

How do I connect the Greenline and the Wolf River Greenway?

Wolf Crossing connects them, and it is mile fourteen of the Wolf River Greenway Trail, with a 270 foot cable stayed suspension bridge and a raised concrete boardwalk through the Lucius Burch State Natural Area. It opened in November 2021 and joins the Greenline with the greenway to the east.

Where can I park to ride the Wolf River Greenway?

Published trailheads include Hyde Park Section at 1833 North Hollywood Street with trailhead parking, McLean Cycle Track at 2149 James Road with street parking, and Shady Grove Trailhead at 6324 Humphreys Boulevard with a parking lot. See the Wolf River Greenway page.

Is the Wolf River Greenway paved?

Yes, it is a 12 foot wide paved pathway built in phases. TrailLink lists the surface as asphalt and notes biking, inline skating, walking, and wheelchair access. Open mileage differs by source: 14 miles per Wolf River Conservancy, 13.4 per TrailLink.

Can a 15-year-old ride a Class 3 eBike?

Not as the operator on a street. Since July 1, 2026, Tennessee requires operators of a Class 3 on a street or highway to be at least 16. Under 16, a rider may be a passenger only. Class 3 is also barred from most paths.

How long are the unpaved trails in Shelby Farms Park?

Tour de Wolf is 6.0 miles, the White Trail 1.9 miles, the Blue Trail 3.6 miles, and the Yellow Trail 3.5 miles. Tour de Wolf has a bike repair station. See the Shelby Farms Park trails page.

Is there a fee to ride these routes?

No fees are published for the Greenline, the Wolf River Greenway, or the park trails on the manager pages. Hours and closures are also not listed here, so check the manager map and posted signs before you head out.

All eBike shops in Shelby County

Ready to find a bike or a rental? Browse all Shelby County eBike shops in Memphis, Germantown, and Cordova.