Scene in Laporte County, Indiana, farm road
⚡ Indiana
Explore LaPorte County by eBike
eBikeListings › Indiana › LaPorte County › Things to Do

Things To Do on an eBike in Laporte County, IN

Laporte County rides in two pieces. In Michigan City, the Singing Sands Trail runs in two city-listed phases of 2.2 and 1.4 miles. In La Porte, the Chessie Trail is a 1.5-mile paved path on Pine Lake. Indiana Dunes National Park adds long gravel rail trails, including the 19.0-mile round trip Calumet Bike Trail. None of these is a big loop, so most days here are short out-and-back rides stacked together.

2026 is a closure year. The Singing Sands boardwalk is closed for construction, and the National Park Service lists Marquette Greenway construction, Glenwood Dunes closures, and Little Calumet / Mnoke Prairie closures that run through December 31, 2026. Read the route notes below, then confirm with the land manager before you go. Our Indiana eBike laws guide covers the state rules.

Orientation map, not a verified riding route.Open county map

Where to ride in Laporte County

Laporte County Parks also lists Red Mill Park, 160 acres just south of Michigan City off U.S. Highway 421. It opened June 29, 2002, and offers multi-use trails for hiking and mountain biking. We did not find a published trail mileage or an e-bike rule for Red Mill Park, so it is not one of the named routes below. If you want to try it, call the park manager first and ask whether e-bikes are allowed on the mountain bike trails.

The practical way to use this page: pick the manager first, then the route. A short city path is a good first ride on a new bike. A long gravel rail trail is a better fit once you know how your battery behaves. Because the access rules differ by manager, the e-bike rule is spelled out in each route entry below instead of being assumed.

eBike shop hubs

Use these city directories for addresses, phone numbers, detail pages, and claim links. The directory data for this county groups shops under La Porte and Michigan City. A city page is a contact index. It does not prove current stock or route access, so call before you drive.

The full county list is on the Laporte County eBike shops hub. If you need a battery or motor checked before a trip, the shop cards further down this page are the place to start. Graveyard Cycle is listed as a bicycle repair shop, and the others are listed as bicycle shops.

Rental shops

None of the cards in the Laporte County directory is listed as a rental business. We are not adding rental cards that do not exist. If you need to rent an eBike for a Laporte County ride, call the shops in the cards below and ask directly whether they rent, for how long, and with what class of bike. Do not plan a ride day around a rental that has not been confirmed by phone.

Named eBike routes in Laporte County

1. Singing Sands Trail, Phase I (2.2 miles)

Start and finish: The City of Michigan City lists Phase I as connecting the Calumet Trail at the Porter/LaPorte County line to City Hall in Michigan City, 2.2 miles in length. Start at either end. If you start at the county line, you can pair this with the Calumet Bike Trail described below. Surface: the city page does not state a surface for this phase, so look at the trail before you commit a narrow tire. E-bike rule: the city lists trail uses as non-motorized except for electric wheelchairs and describes the trails as bike and pedestrian trails. That wording does not mention e-bikes either way, so call the city or read the signs at the trailhead before you ride one. Closure note: the city lists the Singing Sands Trail boardwalk as closed for construction. Etiquette: it is a shared bike and pedestrian trail, so pass walkers slowly, call out before you overtake, and keep the assist low near City Hall where foot traffic is most likely.

2. Singing Sands Trail, Phase II (1.4 miles)

Start and finish: Phase II crosses Highway 12 at Michigan Blvd, follows Michigan Boulevard to 8th Street, then E. 8th Street to E Street, where it connects to the existing Trail Creek Greenway Trail, and terminates at Liberty Trail. Total length is 1.4 miles. Surface: not stated on the city page. Because it follows named streets, expect to share the corridor with road crossings, and the Highway 12 crossing is the one to slow down for. E-bike rule: the same city wording applies, non-motorized except electric wheelchairs, with no e-bike statement found. Ask the city or follow the posted signs. Etiquette: stop fully at the Highway 12 crossing, walk the bike if the crossing is busy, and do not let the assist push you through a gap you would not take on a regular bicycle.

3. Chessie Trail (1.5 miles)

Start and finish: La Porte Lakeside describes the Chessie Trail as a 1.5-mile paved multi-use path connecting Kiwanis-Teledyne Park on Pine Lake to the NewPorte Landing development. The trail page lists hiking, biking, running, walking, and dog walking as activities. Start at Kiwanis-Teledyne Park if you want to begin at the lake. Surface: paved. E-bike rule: no e-bike rule was found on the trail page, so the Indiana default applies and you should check posted signs at the park. See the state guide linked below for the class rules. Etiquette: because dog walkers and runners use the same path, ride at walking pace past them, keep to the right, and pass only when you can see clear path ahead. At 1.5 miles one way, it is a good warm-up ride before a longer day.

4. Calumet Bike Trail, Indiana Dunes National Park (19.0 miles round trip)

Start and finish: the National Park Service lists the Calumet Bike Trail at 19.0 miles round trip, gravel, and flat. Our sources do not name a trailhead for it, so open the NPS biking page for the access point before you drive. The Singing Sands Phase I description above also says it connects to the Calumet Trail at the Porter/LaPorte County line. Surface: gravel, so a wider tire is more comfortable than a slick commuter tire. E-bike rule: the park states that e-bikes are allowed where traditional bicycles are allowed and prohibited where traditional bicycles are prohibited. The park defines an e-bike as a two- or three-wheeled cycle with fully operable pedals and an electric motor of less than 750 watts (1 horsepower). Closure note: NPS lists Marquette Greenway construction throughout 2026 with some temporary closures of park trail segments, so check the current notice for the segment you plan to ride. Etiquette: at 19.0 miles round trip, plan the turnaround by battery, not by pride. Leave reserve for the return.

5. Marquette Bike Trail, Indiana Dunes National Park (4.6 miles round trip)

Start and finish: the National Park Service lists the Marquette Bike Trail as gravel, 4.6 miles round trip, a rail trail, and flat. As with the Calumet trail, our sources do not name a trailhead, so use the NPS biking page to find the access point. Surface: gravel rail trail. E-bike rule: the same park rule applies, e-bikes allowed where traditional bicycles are allowed. Closure note: Marquette Greenway construction is scheduled throughout 2026, and the Marquette Bike Trail is a likely place to find a detour sign, so confirm its status with NPS before you load the bike. Etiquette: this is a short trail, so keep it relaxed. Ride single file, give hikers room, and do not use the throttle or high assist to run up on slower riders from behind.

Half-day and full-day eBike plans

Half day, city paths (1 to 2 hours): Ride the Singing Sands Trail Phase I, 2.2 miles, from the county line to City Hall in Michigan City, then Phase II, 1.4 miles, toward Liberty Trail. That is 3.6 miles of one-way riding, or 7.2 miles if you ride both and return the same way. Confirm the e-bike rule with the City of Michigan City first, since its page lists the trails as non-motorized except electric wheelchairs.

Half day, La Porte (about 1 hour): Ride the Chessie Trail from Kiwanis-Teledyne Park to NewPorte Landing and back. That is 3.0 miles total on a paved path. Stop at the lake and check the signs before you leave.

A sensible split for a two-day visit is city paths and the Chessie Trail on one day, and the park gravel on the other. Shop contacts for a battery or tire problem are in the cards after the FAQ. Do not assume a trailhead has an outlet, and do not plan to charge on the trail.

What not to ride in Laporte County

The closed Singing Sands boardwalk. The city lists it as closed for construction. Do not go around barriers.

Closed park segments. NPS lists Glenwood Dunes Trail System segments closed beginning April 1, 2026, and expected to remain closed through December 31, 2026. It lists Little Calumet / Mnoke Prairie Trail segments closed beginning May 1, 2026, with the same expected end date. Marquette Greenway construction also closes some park segments during 2026. Today is November 3, 2026, so assume these closures are still in effect and check NPS before riding.

Anywhere bicycles are prohibited. The park states that e-bikes are prohibited where traditional bicycles are prohibited. If a path is signed for walking only, an e-bike does not get an exception.

City trails without confirming the e-bike rule. Michigan City describes its trails as non-motorized except electric wheelchairs. Until the city tells you otherwise, do not assume your e-bike is welcome on a Singing Sands phase. Ask first.

Red Mill Park singletrack, until you call. The park lists multi-use trails for hiking and mountain biking, and we found no e-bike statement. Do not assume.

When to ride Laporte County

For 2026 the dates that matter are the closure windows. Glenwood Dunes segments are expected to stay closed through December 31, 2026, and so are the Little Calumet / Mnoke Prairie segments. Marquette Greenway construction runs throughout 2026. If you are reading this in November 2026, the park gravel trails may have detours or closed segments for the rest of the year, so the city paths and the Chessie Trail are the more predictable choices.

We do not have a published seasonal calendar from the trail managers, so we are not going to guess at the best month. Plan around the closure dates above, then check the manager notice for the specific day. For 2027, recheck the NPS biking page in January, because closure dates may change or end.

Indiana eBike rules snapshot

The Indiana Dunes rule is the clearest one we can source: e-bikes are allowed where traditional bicycles are allowed, and prohibited where traditional bicycles are prohibited. The park defines an e-bike as a two- or three-wheeled cycle with fully operable pedals and an electric motor of less than 750 watts (1 horsepower).

For state law, our Indiana eBike laws guide is the source we use. It was checked against official sources in October 2026 and cites Indiana Code §9-21-11-13.1. It explains that Indiana uses three classes, covers the Class 3 age and helmet rules, and notes that path access depends on class. Read it before you buy or borrow a bike, and match your bike to the class on its label.

City and park rules can be narrower than state rules. Michigan City lists its trails as non-motorized except for electric wheelchairs. Where no e-bike rule was found, the state default applies and the posted sign wins. For the county overview, return to the Laporte County hub, and for more reading see the eBikeListings blog.

Frequently asked questions

What is the longest eBike route listed for Laporte County?

The Calumet Bike Trail in Indiana Dunes National Park is listed by NPS as gravel, flat, and 19.0 miles round trip. Check the NPS biking page for current closures before you ride.

Are eBikes allowed on Indiana Dunes National Park bike trails?

NPS states that e-bikes are allowed where traditional bicycles are allowed and prohibited where traditional bicycles are prohibited. NPS defines an e-bike as a two- or three-wheeled cycle with fully operable pedals and an electric motor of less than 750 watts.

Can I ride an eBike on the Singing Sands Trail?

The City of Michigan City lists trail uses as non-motorized except for electric wheelchairs. We found no e-bike statement, so ask the city and follow the posted signs. The city also lists the boardwalk as closed for construction.

Which Indiana Dunes trails are closed in 2026?

NPS lists Marquette Greenway construction throughout 2026 with some temporary segment closures, Glenwood Dunes segments closed from April 1, 2026 through December 31, 2026, and Little Calumet / Mnoke Prairie segments closed from May 1, 2026 through December 31, 2026.

Do the Laporte County shop cards confirm eBike rentals?

No. None of the cards is listed as a rental business. Call the shop and ask directly before you plan a ride around a rental.

Where can I read the Indiana eBike rules?

Our Indiana eBike laws guide at /blog/ebike-laws-indiana/ covers the three classes, the Class 3 age and helmet rules, and path access by class. Local managers can be narrower than state law.

Local shop and repair contacts

These cards are preserved from the directory for sales, repair, or general enquiries. They are not presented as rental operators.

Bicycle repair shop · Michigan City, IN
★★★★★5.0(35 reviews)
📍 709 E Barker Ave Michigan City, IN 46360 📞 (219) 699-7003
Bicycle Shop · Michigan City, IN
★★★★½4.7(103 reviews)
📍 609 East US-20 Michigan City, IN 46360 📞 (219) 872-9228
Bicycle Shop · La Porte, IN
📍 1309 Pne Lk Ave La Porte, IN 46350 📞 (219) 402-0150

All eBike shops in Laporte County

The complete local directory is the Laporte County eBike shops and repair contacts page. This guide owns route planning; the county hub owns the full shop list.